Approved Code of Practice for Cranes
Appendix H: Tower crane inspections checklists (informative)
TOWER CRANE CLIMBING FRAME INSPECTION TEST REPORT/WORKSHEET
Proposed Ground Inspection Date:........................
KEY PERSONNEL
| Crane Supervisor: | Inspector: |
IDENTIFICATION
| Owner/Controller: | Site Address: | |
| Address: | ||
| Yard Address: (If appl) | ||
| Climbing Frame Model: | Serial No: | File No: |
| Manufacturer: | Other Identification: | |
GROUND INSPECTION (Inspection Valid for 12 months)
| Structure: | Corrosion: | |
| Pins: | Split Pins: | |
| Bolts & Nuts: | Rollers: | |
| Hydraulic Hoses and Fittings: | Hydraulic Cylinder & Ram: | |
| Handrails: | Platforms: | |
| Rails: | Rail Components/Wheels: | |
| Elect. Plugs & Cables: | Hydraulic Fluid Level: | |
| Pressure Gauges | Climbing Feet & Mechanicals: | |
| Comments: | ||
Inspector Signature.................................
Date:..........................................
PRE- OPERATION INSPECTION 1. (Inspection valid for one climbing sequence only)
| Correct Installation: | Handrails & Platforms: |
| Pins: | Split Pins: |
| Bolts & Nuts: | Rollers: |
| Elect Plugs & Cables: | Rail Components/Wheels: |
| Hydraulic Fluid Level: | Hydraulic Tank Breather: |
| Power Supply: | Hydraulic Pump Rotation: |
| Hydraulic Hoses & Fittings: | Cylinder Operation: |
| Gauges Working: | Manual On Site: |
| Comments: | |
Climbing Supervisor.................................
Date:..........................................
PRE- OPERATION INSPECTION 2. (Inspection valid for one climbing sequence only)
| Correct Installation: | Handrails & Platforms: |
| Pins: | Split Pins |
| Bolts & Nuts: | Rollers: |
| Elect Plugs & Cables: | Rail Components/Wheels: |
| Hydraulic Fluid Level: | Hydraulic Tank Breather: |
| Power Supply: | Hydraulic Pump Rotation: |
| Hydraulic Hoses & Fittings: | Cylinder Operation: |
| Gauges Working: | Manual On Site: |
| Comments: | |
Climbing Supervisor.................................
Date:..........................................
PRE- OPERATION INSPECTION 3. (Inspection valid for one climbing sequence only)
| Correct Installation: | Handrails & Platforms: |
| Pins: | Split Pins |
| Bolts & Nuts: | Rollers: |
| Elect Plugs & Cables: | Rail Components/Wheels: |
| Hydraulic Fluid Level: | Hydraulic Tank Breather: |
| Power Supply: | Hydraulic Pump Rotation: |
| Hydraulic Hoses & Fittings: | Cylinder Operation: |
| Gauges Working: | Manual On Site: |
| Comments: | |
Climbing Supervisor.................................
Date:..........................................
PRE- OPERATION INSPECTION 4. (Inspection valid for one climbing sequence only)
| Correct Installation: | Handrails & Platforms: |
| Pins: | Split Pins |
| Bolts & Nuts: | Rollers: |
| Elect Plugs & Cables: | Rail Components/Wheels: |
| Hydraulic Fluid Level: | Hydraulic Tank Breather: |
| Power Supply: | Hydraulic Pump Rotation: |
| Hydraulic Hoses & Fittings: | Cylinder Operation: |
| Gauges Working: | Manual On Site: |
| Comments: | |
Climbing Supervisor.................................
Date:..........................................
"
" means "Done"; "X" means "Concern!, - refer Notes";
"NA" means "Not Applicable"; "Nothing" means "Inspection Uncompleted!"